Transport Minister Chris Bishop announced today that a construction contract has been awarded by the NZ Transport Agency (NZTA) to Oxcon for the two-lane replacement of the Mangati Bridge on State Highway 39 (SH39) between Ōtorohanga and Pirongia. “NZTA has worked at pace since a single-lane Acrow (Bailey-style) temporary bridge was installed in March to […]