Tag Archives: oceania

Man suffers serious burns in alleged assault in Newcastle

A man has suffered serious burns after he was set on fire in Newcastle this morning.

NSW Police were called to a fast-food restaurant on King Street when the 23-year-old suffering from serious burns on his body sought help at 3.20am.

"The man was taken to John Hunter Hospital before he was transferred to Royal North Shore Hospital, where he remains in a serious but stable condition," NSW Police said in a statement.

READ MORE: Crane collapses at new Sydney Fish Market

Newcastle serious burns

Police are appealing for any witnesses to come forward.

Investigations are continuing.

Man accused of hitting boys 'unfamiliar with driving'

A driver accused of crashing into two children playing in a laneway behind their grandparents' home was unfamiliar with driving a car and had only been in Australia for six days.

Ngoc Thanh Vo is charged with dangerous driving over a crash in Braybrook, in Melbourne's west, on Tuesday evening.

A three-year-old boy suffered minor injuries, while an eight-year-old boy has undergone surgeries for multiple serious injuries after being pinned between two cars.

READ MORE: Record-breaking scorcher forecast for NRL Grand Final Day

Vo, who arrived in Australia from Vietnam six days before the incident, allegedly mistook the accelerator for the brake when driving in the laneway behind four townhouses.

Police told Melbourne Magistrates Court on Thursday Vo was unlicensed and generally unfamiliar with driving a car when he went out on his own for a drive around the block in a Toyota Prado.

CCTV footage allegedly shows Vo return to the laneway where the vehicle suddenly accelerated, striking three parked cars and the two children.

The younger boy was hit by one of the parked cars while the older one was pinned between the Prado's bull bar and the back of a second car.

Both he and the car were pushed over a concrete gutter at the end of the laneway, down a grass embankment, across a road and into the fence of a neighbouring property, the court heard.

READ MORE: Terrifying moment bear crashes boy's birthday picnic

He remained pinned until emergency services arrived, and has suffered pelvis, leg and femoral artery injuries which have required surgeries, police said.

The court heard Vo was in Australia on a partner visa, living with his wife who supported him in court.

Police have sought 12 weeks to put together a brief of evidence, which is expected to include mechanical reconstruction of the crash and forensic analysis of the boys' injuries.

Vo, who is on bail, is due back in court on January 31, 2024.

He is also charged with reckless conduct endangering serious injury, unlicensed driving and careless driving.

Worker injured after crane collapse at new Sydney Fish Market site

The company constructing the new $750 million Sydney Fish Market building has confirmed one worker was injured when a crane collapsed at the the site today.

The crane jib fell onto scaffolding at the Blackwattle Bay site on Bridge Road in Pyrmont just after midday.

Paramedics treated one man, aged in his 30s, for minor back injuries.

READ MORE: Where are double demerits in force for October long weekend?

A crane has collapses at the Sydney Fish Market building site.A crane has collapses at the Sydney Fish Market building site.

Multiplex confirmed the crane collapsed within the grounds of the site.

"The site has been evacuated and there is no risk to the workforce or public," Multiplex said in a statement.

"We are offering our full support to emergency services, SafeWork NSW and the workforce.

"We will work with the relevant authorities to carry out a full investigation."

https://omny.fm/shows/afternoons-with-deborah-knight/breaking-crane-collapses-near-2gb-studios-at-fish/embed

A witness, Steven, told Nine radio station 2GB the crane "sliced right through to the second level with the scaffolding" at the site.

Fire and Rescue NSW and police crews responded to the collapse.

"A man was treated on scene by NSW Ambulance paramedics and will be taken to St Vincent's Hospital in a stable condition," NSW Police said in a statement.

"Safe Work NSW will investigate the circumstances surrounding the incident."

A crane has collapses at the Sydney Fish Market building site.Crane collapse at new Sydney Fish Market building site.

Live Sydney Traffic said one eastbound lane of Bridge Road was closed at Wentworth Park.

"Traffic is slow both ways and there are a lot of pedestrians in the area," Live Traffic Sydney said.

The new Fish Market will cost NSW taxpayers $750 million.

Replacing the existing market nearby, the precinct is expected to attract six million people each year.

"The design is a world-class piece of architecture, with a distinctive wave-shaped and scale-patterned roof that pays homage to the fishing industry," the project is billed on its website.

The new building is due to open in 2024.

Teenager dies after falling from construction site

A teenage tradie has died after falling from a construction site on Tuesday.

Tyler Whitton, 17, suffered a serious head injury after falling from a construction site at Victoria Street in West End, Brisbane.

His life support was turned off on Wednesday morning at the Royal Brisbane and Women's Hospital. His grandfather confirmed his passing in a Facebook post on Thursday morning.

It was Whitton's first year on the job, it is understood.

READ MORE: Sony investigates claims of cyberattack, data leak on dark web

"It is with a heavy heart and heartfelt sadness, that today I say goodbye to my beloved beautiful grandson Tyler," Jack Whitton wrote.

The exact distance he fell is unknown. Paramedics said he fell 2.5 metres while his family claimed it was 4 metres.

He was taken to hospital following the incident and was placed into an induced coma.

Workplace Health and Safety Queensland have launched an investigation following the incident on Tuesday and have issued a non-disturbance notice to secure the scene.

Workplace Health and Safety Queensland have been contacted for comment. 

Traditional owner wins legal bid to stop Woodside's seismic blasting

A traditional owner has successfully challenged Woodside Energy's plan to begin seismic blasting off northern Western Australia as part of its Scarborough Gas Project.

Traditional custodian Raelene Cooper, a Mardudhunera woman, filed for a judicial review in August of the regulator's decision to approve Woodside's blasting plan, arguing the National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) made a legal error.

Federal Court Justice Craig Colvin agreed.

READ MORE: Sri Lankan cricketer found not guilty of sexual assault

Woodside's Pluto Plant at Scarborough, Western Australia.

Despite finding Woodside's legally required consultation with First Nations stakeholders was inadequate, NOPSEMA gave approval for the seismic blasting on July 31, attaching a condition that further consultation needed to be carried out before blasting began.

Justice Colvin found on Thursday NOPSEMA had erred because the consultation should have been carried out before the approval was granted and set aside the regulator's decision.

A Woodside spokesperson said the company would continue to work with NOPSEMA to have an accepted environmental plan in place before commencing the seismic survey.

On September 14 Justice Colvin granted an urgent interlocutory injunction preventing Woodside from starting blasting until Thursday.

Seismic testing involves ships towing special airguns that blast compressed air, creating pulses of sound.

READ MORE: Dad of three thought he had the flu. Soon he was fighting for his life

This sound energy is directed at the sea floor and penetrates underlying rock layers, with the sound patterns recorded used to build a picture of geological layers, and oil and gas reserves, beneath the seabed.

According to the Environmental Defender's Office, which is representing Ms Cooper, the impacts of seismic blasting on marine animals such as whales can include damage to their hearing and their ability to communicate, stress, displacement from habitat, physical injuries and death.

Woodside argued the ongoing delay to starting its seismic survey is causing significant costs.

The massive Scarborough field is located about 375km off WA's northwest coast.

The gas project will be connected to new offshore facilities by a 430km pipeline to the onshore Pluto liquid natural gas facility, near Karratha.

The project's development phase will include the installation of a floating production unit with eight wells drilled initially, and 13 wells across the life of the gas field.

Woodside expects to process about five to eight million tonnes of gas a year.

The judge awarded costs to Ms Cooper.